Get Started Today! 800-239-5950

Newsletter Archive

History of Horizontal Wells

Sideways Sparging

The Longest Well

Waste Handling 101

HDD Geometry 201

Extracting Water from Horizontal Wells

Horizontal Soil Sampling

Changing Direction Mid-Bore

How to “Develop” an SVE Well

Horizontal Well Geometry 101

A Trip Down Military Lane

Aug 2020 – Accounting for Elevation in HDD Well Design and Installation

May 2020 – Horizontal Media Treatment Well

April 2020 – Horizontal Well Surface Completions

Feb 2020 – Rehabilitation of Horizontal Remediation Wells

Nov 2019 – Sub Slab Horizontal Wells

Exciting News from DTD!

Nov 2018 – Confessions of a Recovering Vertical Driller

July 2018 – Common Misconceptions About Horizontal Remediation Wells

December 2017 – Waste, Waste, and More Waste

August 2017 – Directional Water Wells, Really!

April 2017 – National Digging Safe Month

March 2017 – Coal Combustion Residual Dewatering Goes Sideways

December 2015 – Blind Well Installation Record

November 2015 – Horizontal Wells for Remediation

June 2015 – Waste Management on HDD Projects

April 2015 – Horizontal Well Installations – Site Preparation and Preplanning are Paramount

February 2015 – Horizontal Well Installations – Not Just For Large Projects

November 2014 – Horizontal Environmental Drilling Fluids – Let’s Get Muddy

October 2014 – Horizontal Environmental Drilling – Not Just for Well Installation Anymore or You Want a Soil Sample from Where?

July 2014 – A Different Spin on HDD Navigation

June 2014 – Horizontal Environmental Drilling Safety – If You Can’t Stand the Heat….

December 2013 – What is HDD and How does it work?

April 2014 – Putting the Direction in Directional Drilling

February 2014 – Drill Rig Setback