Get Started Today! 800-239-5950

Author Archives: Dan

DTD Oxygen Injection Wells to Be Featured in Presentation at Battelle Bioremediation Conference

Posted on

DTD teamed with Black & Veatch and Matrix Oxygen Injection Systems to design deep horizontal wells for low-volume oxygen injection…


Innovative Approach Allows Long Blind Well Installation

Posted on

DTD has just finished installing a series of long blind wells using an innovative new technique. The process removes the…


Horizontal LNAPL Recovery Well System Completed

Posted on

DTD has wrapped up the installation of four long horizontal LNAPL recovery wells in California. Each well is constructed of…


Horizontal Remediation Well (LNAPL Recovery) Rehab and Video

Posted on

DTD recently conducted a video inspection of a horizontal remediation well that has been in use as a product recovery…


Long Horizontal LNAPL Recovery Well Pullback

Posted on

The picture below shows the pullback of a 6-inch diameter stainless steel well. The 1,800′ long horizontal well is designed…


1,000+ ft Horizontal Dewatering Well Installed

Posted on

DTD has just completed installing the first of a pair of dewatering wells. The 1,030′ long 6-inch diameter well was…


SVE wells completed near Indy

Posted on

SVE is a common and efficient application of horizontal wells for environmental remediation.  Relatively short single-ended (blind) horizontal wells can…


Difficult ground encountered while installing 10 SVE wells at Superfund Site

Posted on

This Indiana site required the installation of 10 horizontal SVE wells beneath and through an area of fill, waste, and…


DTD Completes 2,100+ ft bore

Posted on

DTD superintendent James Ditto and crew completed the installation of a 2,150 ft bore crossing the Dan River near the…


2,100′ Bore chewing up drill bits!

Posted on

DTD is in the midst of drilling a long bore (2,100’) crossing the Dan River in Virginia. The crossing requires…