February 2018 Directed Technologies Drilling (DTD) was formed in 1996 with scientists and engineers designing and installing horizontal environmental and water…
DTD recently completed the installation of two 850′ long horizontal sparge wells in Southern Ohio. Understanding the local geology on…
Completing environmental remediation projects at industrial sites can be complicated when operations take place at facilities with limited space to…
When we think of unforeseen challenges of horizontal drilling, we usually think of challenges underground; fractured rock, gravel and cobble, lost drilling mud,…
Visit Directed Technologies Drilling at the Nevada Water Resources Association Annual Conference – February 14-16, 2017. The event is being…
When thinking about the use of horizontal wells for environmental remediation projects, a common misconception is that the technology is…
DTD has completed the installation of an 860 foot, 4-inch diameter steel pipeline beneath an extensive wetland and small headwaters…
Occasionally there are HDD shots that are completed because there is simply no other way. DTD was involved in such…
Through the years, countless dry cleaners have been located in commercial strip malls. Over time, some of these facilities close…
Visit DTD at the SAME Small Business Conference, Atlanta Cobb Galleria Centre – November 16th – 18th. At Booth 319,…