Get Started Today! 800-239-5950

Category Archives: Pipeline

8″ Waterline Beneath Slab Cabin Run

Posted on

In early August DTD completed a HDD crossing of Slab Cabin Run in State College, Pennsylvania. Slab Cabin Run is…


Pecos River Crossing

Posted on

DTD has completed a pullback of 1,000 feet of 16” Steel beneath the Pecos River near the New Mexico/Texas border….


Pipeline Construction Picking up

Posted on

The cold winter and wet spring seemed to stall the early season pipeline construction. Its not likely weather actually slowed…


Cold Weather Pipeline Installation

Posted on

Just because the “Polar Vortex” has descended over the lower 48 it doesn’t mean pipeline installation has to stop. DTD…


20-inch Pipeline and New Support Equipment

Posted on

DTD continues its directional drilling for pipeline installation in the upper mid-west, having recently completed the installation of four bores…


Midwest River Crossing – 830′ of 16″ steel

Posted on

Directed Technologies Drilling recently completed a river crossing and pullback of 16″ pipeline in the Midwest. The pipeline was necessary…


Short Gathering Line – 310′ of 4″

Posted on

DTD’s Vermeer D36x50DR dual rod rig was put back to work near Pittsburgh, Pennsylvania with a 310’ crossing under a…


Meshoppen Creek Crossing – 1415′ of 10″

Posted on

With DTD’s reputation in successful completion of difficult pipeline crossings, we were once again asked to return to Northern Pennsylvania…


DTD’s New Dual Rod Rig at Work on Texas Road Crossings

Posted on

Using DTD’s new Vermeer D36x50DR rig, we recently completed four road crossings near Fort Worth, Texas.  The “DR” is a…


DTD Pipeline

Posted on

When DTD opened its Pennsylvania office in 2004, very few people in the oil and gas industry were excited about…