Get Started Today! 800-239-5950

Author Archives: Jason

Challenging 6-inch Steel Pipeline Crossing Completed

Posted on

DTD has completed the second of two installations, pulling back 6-inch diameter gas pipeline near Clarion, PA. The bore crossed…


Utility installations for Environmental Projects

Posted on

Remediation wells, whether vertical or directional, generally need to be connected to a treatment system, and sometimes to power, control…


Dual Phase Extraction Under New England Big-Box Store

Posted on

DTD has recently completed a pair of horizontal dual-phase extraction (DPE) wells beneath a busy wholesale store. The wells were…


Western PA HDD for Gas Gathering Line

Posted on

DTD has started drilling a small diameter (6-inch) section of gas pipeline near Clarion, PA.   This small gathering line…


Sparge Wells at a mid-Atlantic Air National Guard

Posted on

In August 2015 DTD mobilized to a mid-Atlantic air national guard base to supplement an existing  remediation system by adding…


SVE System Installed Under Operating NJ Manufacturing Facitliy

Posted on

DTD recently completed the installation of a sub-slab soil vapor extraction (SVE) system in central New Jersey.  The relatively short…


Industrial Park Site Remediation

Posted on

DTD has completed the installation of four ETEC groundwater injection wells beneath a industrial park building outside New York City….


2,800′ of 10″ Steel Gas Line – Tunkhannock, PA

Posted on

DTD has recently completed the installation of a 10″ gas line near the town of Tunkhannock, Pennsylvania. The bore  proved…


Northeast PA Pipeline Project Underway

Posted on

DTD is working on a natural gas pipeline in the Northeastern Pennsylvania and taking extra steps to ensure successful installation. …


Horizontal SVE well at a California Dry Cleaner

Posted on

Just after the 4th of July DTD finished a small horizontal soil vapor extraction installation (SVE) in Santa Rosa, California. …