Get Started Today! 800-239-5950

Author Archives: Jacob Gallagher

How to “Develop” an SVE Well

Posted on

Volume 8, Issue #3 – March 2022 If you’ve ever installed a vertical soil vapor extraction (SVE) well, you enjoyed…


Limited Access – Not Always About Space

Posted on

Generally, when we think of the term “limited access” as it pertains to a drilling project we think of “tight…


Pilot Study to Full Scale – SVE System

Posted on

Ellingson crews recently had the opportunity to install a “full-scale” soil vapor exctraction (SVE) system at a site where we’d…


Horizontal Well Geometry 101

Posted on

Volume 8, Issue #2 – February 2022 In this month’s newsletter we’re going to cover some basic principles of horizontal…


Conductor Casing at an Angle – Part 2

Posted on

Last month we shared a post about a project where our crews installed a horizontal gravity drain. The construction included…


2022 EnviroWorkshops – CEU Opportunities

Posted on

As 2022 gets into full swing, don’t forget to set aside time to earn the necessary continuing education units (CEUs)…


A Trip Down Military Lane

Posted on

Volume 8, Issue #1 – January 2022 Every now and then it’s fun to kick back and think about past…


Conductor Casing at an Angle

Posted on

Elingson crews recently completed a horizontal dewatering well that featured a cemented conductor casing at the surface. While not every…


Blind Horizontal Wells – New Technology

Posted on

Most HDD contractors will tell you they prefer constructing double-ended well designs over “blind” horizontal wells (single-ended construction). This preference…


Renewables and Ellingson

Posted on

As we update and ugrade our grid infrastructure to rely more and more on renewables (i.e. wind and solar power),…