Get Started Today! 800-239-5950

Author Archives: Jason

Dual Purpose Horizontal Well

Posted on

In December 2018, DTD installed a dual purpose horizontal well as part of a remediation pilot test at a chemical…


Gas Pipeline in the Midwest

Posted on

DTD is beginning 2018 with the three bores for pipeline installation in the Midwest.  The crossings trend beneath a small…


Half a Mile of HDPE – Ingenuity and Adaptive Methods to Install DTD’s Longest Wells Ever

Posted on

Client demands for ever-longer wells continues to push the limits of what can be accomplished using HDD to install horizontal…


Maxi-Rig Horizontal Sparge Wells in Ohio

Posted on

DTD recently completed the installation of two 850′ long horizontal sparge wells in Southern Ohio.  Understanding the local geology on…


Pipeline HDD in Winter

Posted on

When we think of unforeseen challenges of horizontal drilling, we usually think of challenges underground; fractured rock, gravel and cobble, lost drilling mud,…


Horizontal Remediation in the Southwest

Posted on

Heading back to the southwest after the holiday break, DTD completed the installation of a horizontal remediation system in the…


Small Diameter Pipeline

Posted on

DTD has completed the installation of an 860 foot, 4-inch diameter steel pipeline beneath an extensive wetland and small headwaters…


Horizontal Remediation Well for Groundwater Extraction at Gulf Coast Facility

Posted on

This Spring DTD completed the installation of an 1,130′ horizontal remediation well using our patent pending Knock Off Technology. The…


Utility Boring at Southern DOD Facility

Posted on

DTD completed the installation of a short utility boring that crossed beneath a small street and multiple existing utilities.  Total length…


Arkansas Horizontal Dual-Phase Extraction Wells

Posted on

DTD has recently completed a small scale project near Little Rock, AR.  Plans for bettering the subsurface conditions included two dual phase…