Get Started Today! 800-239-5950

End of Year Rush

Posted on

Our clients are pushing hard to get in the last projects of 2016. DTD is installing horizontal remediation wells at four environmental sites this week:

Unloading 2440

Unloading 2440

  1. a Vermeer 2440 installing a remediation system at a gas station with three horizontal air sparge and two horizontal soil vapor extraction wells in Indiana
  2. a big rig installing one horizontal air sparge well at mid-west refinery
  3. a Vermeer 3650DR installing a remediation system at a gas station including four horizontal soil vapor extraction and two horizontal air sparge wells the high plains of the southern Rockies…
  4. another Vermeer 2440 installing the last three of a dozen horizontal injection wells at a Superfund Site in California.