Complex Project Coordination – 3 Tips

Posted on

As HDD contractors, we have seen a complex project or two. Sure, most jobs only involve installing a couple of…


Aug 2020 – Accounting for Elevation in HDD Well Design and Installation

Posted on

Accounting for Elevation During Horizontal Well Design and Installation Since a vertical well or boring is a single point relative…


Horizontal ERH – The Fusion of Two Technologies

Posted on

Horizontal Electrical Resistance Heating (ERH) is the integration of two remediation technologies: horizontal wells and ERH. Horizontal wells are noted…


May 2020 – Horizontal Media Treatment Well

Posted on

May 2020 Horizontal, Media Treatment Well Horizontal wells have been used to facilitate a wide variety of active remediation methods…


April 2020 – Horizontal Well Surface Completions

Posted on

Horizontal Well Surface Completions One of the common questions we get when working with consultants and owners is “what does…


Feb 2020 – Rehabilitation of Horizontal Remediation Wells

Posted on

Rehabilitation of Horizontal Remediation Wells Although horizontal directional drilling for environmental remediation has been around since 1987, most of the…


Thermal Remediation, Shallow Angle

Posted on

Ellingson-DTD (DTD) directionally drilled six thermal remediation wells earlier this year. The project required source area remediation beneath a training…


Nov 2019 – Sub Slab Horizontal Wells

Posted on

Sub Slab Horizontal Wells – Vapor Mitigation and Mass Removal Since the beginning of 2019, Ellingson-DTD has completed seven projects…


Passive Treatment HRX Well to Receive NGWA Technology Award

Posted on

As an innovator in the realm of horizontal drilling for site remediation, Ellingson-DTD has been pleased to introduce a variety…


DTD Acquired by Ellingson

Posted on

DTD is pleased to announce our acquisition by Ellingson. All of DTD’s management and staff are making the figurative move…