The well design (very low screen open area and multiple casings) required the use of our American Augers 210,000 lbs-rated drill rig and 100% biodegradable drilling fluid. After assembly of the complicated pull-back package (multiple screens and casings) the well was drilled, installed and developed over two weeks
in July.
The
Tags: News