Get Started Today! 800-239-5950

Author Archives: Mike

HDD Wells, Horizontal Well Rehab… and a Hurricane!

Posted on

Mix an ongoing remediation project with new well construction, old well rehab, conveyance lines and railroad crossings, then toss in…


August 2017 – Directional Water Wells, Really!

Posted on

August 2017 Directional Water Wells, Really! Horizontal directional drilling (HDD) methods have been utilized for environmental and engineering applications starting…


DTD Steps Up Water Resources Development with New Patent

Posted on

Over the past few years, DTD has completed several wells for potable water supplies. Most of these were for low…


DTD Wraps Up Extensive Horizontal Sparge Well Project in Alaska

Posted on

As the summer winds down in Alaska, DTD put the finishing touches on our horizontal remediation well installation project at…


Unusual Challenges Overcome in Georgia

Posted on

With more than 20 years as a specialty directional drilling firm, DTD’s project managers have experienced, and overcome, a variety…


First Well Started at Remote Alaskan Site

Posted on

In April, we posted the story of DTD’s initial mobilization effort to ship our CMS 9030 drill rig, mud system,…


North! To Alaska!

Posted on

The Northern Lights have seen strange sights, but the strangest they ever will see, was a directional drill on Million…


Latest “Inflection Points” – Coal Combustion Products Landfill Drain

Posted on

With recent EPA regulations mandating better control of coal combustion product (coal ash) landfills, many owners are evaluating different ways…


March 2017 – Coal Combustion Residual Dewatering Goes Sideways

Posted on

March 2017 Coal Combustion Residual Dewatering Goes Sideways Recently, Directed Technologies Drilling (DTD) field crews installed a horizontal dewatering well…


Patrick Ferringer, PG Joins DTD as Project Geologist

Posted on

BELLEFONTE, PA; February 21, 2017 – Patrick Ferringer, PG, has joined DTD as the newest member of our technical and management…